- (b) Explain the timeline charts and project table methods of project scheduling with suitable examples.
- (b) Explain basis path testing with an example. Write the pros and cons of basis path testing. OR
- (a) Describe the following in detail.
- (i) Risk mitigation (ii) Risk monitoring
- (b) Enumerate the various control structure testing techniques.